TWENTIES
A demonstrative project of wind power-related technologies

Tuesday, 23 November 2010
13:30 - 15:30, Room B06, Berliner Congress Center

TWENTIES project  

TWENTIES is an EU-funded project which aims at the large-scale integration of wind power in the electricity grid. Through 6 full scale demonstrations, the project examines several barriers to accommodate the wind energy required to reach 2020 targets. Demonstrations will address:

  • System services (voltage and frequency) provided by wind farms
  • The feasibility of Virtual Power Plants combining wind farms operation and flexible generation and loads
  • Increasing grid flexibility by coordinating power flow control devices and using dynamic line rating according to actual wind production
  • Configurations and critical components for secure off-shore meshed networks
  • Strategies for balancing large off-shore shut downs under stormy conditions
  • Streamlining the permitting process of off-shore wind farms

The experimental results will be integrated into European analyses to assess the economic impact and the scalability of the solutions

 

Programme

13:30–
13:45

Global project overview
José Luis Mata, Red Eléctrica de España

13:45–
14:00

Demo 1: System Services provided by wind farms
Roberto Veguillas, Iberdrola Renovables

14:00–
14:15

Demo 2: Integration of distributed energy resources through virtual power plants
Klaus Baggesen Hilger, DONG Energy

14:15–
14:30

Demo 3: Critical components and optimal topology for an off-shore DC meshed grid
Anne-Marie Denis, RTE

14:30–
14:45

Demo 4: Optimal strategies to prevent massive wind power shut downs during stormy conditions
Nina Detlefson, Energinet.dk 

14:45–
15:00

Demo 5: Increased grid flexibility by using dynamic line rating, PMU’s and phase shifters coordination
Peter Van Roy, ELIA

15:00–
15:15

Demo 6: Increase grid flexibility by using on line thermal monitoring systems and overhead line controller devices
José Luis Mata, Red Eléctrica de España

15:15–
15:30

Questions and answers

For further information about the TWENTIES  project and this side event, please contact:
Miguel Lorenzo Sotelo: mlorenzo(at)ree.es
José Luis Mata Vigil-Escalera: jlmata(at)ree.es

Supported by Friends of the Supergrid


GRIDS 2010 Event Guide

Questions?

+32 2 213 18 00

events(at)ewea.org


Five reasons to join EWEA