<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
		>
<channel>
	<title>Comments on: Wind energy and other renewables much cheaper than coal</title>
	<atom:link href="http://www.ewea.org/blog/2012/03/wind-energy-and-other-renewables-much-cheaper-than-coal/feed/" rel="self" type="application/rss+xml" />
	<link>http://www.ewea.org/blog/2012/03/wind-energy-and-other-renewables-much-cheaper-than-coal/</link>
	<description>Breath of fresh air</description>
	<lastBuildDate>Sat, 15 Jun 2013 10:44:10 +0000</lastBuildDate>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=3.5.1</generator>
	<item>
		<title>By: M Simon</title>
		<link>http://www.ewea.org/blog/2012/03/wind-energy-and-other-renewables-much-cheaper-than-coal/#comment-15401</link>
		<dc:creator>M Simon</dc:creator>
		<pubDate>Thu, 20 Sep 2012 01:23:03 +0000</pubDate>
		<guid isPermaLink="false">http://www.ewea.org/blog/?p=3014#comment-15401</guid>
		<description><![CDATA[Ah. But there is one little fly in the ointment. Wind is intermittent. And the time scale of that intermittency is seconds. Where as the grid requires production commitments in 15 minute increments for stability. Now add in the cost of storage to make wind technically viable and it is no longer economically viable. 

You guys are not serious because you do not tell the whole truth. Shame on you. But you are right where you belong in that regard. In bed with the politicians.]]></description>
		<content:encoded><![CDATA[<p>Ah. But there is one little fly in the ointment. Wind is intermittent. And the time scale of that intermittency is seconds. Where as the grid requires production commitments in 15 minute increments for stability. Now add in the cost of storage to make wind technically viable and it is no longer economically viable. </p>
<p>You guys are not serious because you do not tell the whole truth. Shame on you. But you are right where you belong in that regard. In bed with the politicians.</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: The Windbaggers charter and energy subsidies &#124; daryanenergyblog</title>
		<link>http://www.ewea.org/blog/2012/03/wind-energy-and-other-renewables-much-cheaper-than-coal/#comment-14490</link>
		<dc:creator>The Windbaggers charter and energy subsidies &#124; daryanenergyblog</dc:creator>
		<pubDate>Wed, 08 Aug 2012 18:27:10 +0000</pubDate>
		<guid isPermaLink="false">http://www.ewea.org/blog/?p=3014#comment-14490</guid>
		<description><![CDATA[[...] to renewables. While in some cases this is likely driven by the fact that, as noted, they are increasingly becoming economically viable options. But in quite a number of cases it is suspected that the motivation is more about protecting vested [...]]]></description>
		<content:encoded><![CDATA[<p>[...] to renewables. While in some cases this is likely driven by the fact that, as noted, they are increasingly becoming economically viable options. But in quite a number of cases it is suspected that the motivation is more about protecting vested [...]</p>
]]></content:encoded>
	</item>
	<item>
		<title>By: Olivier Balhan</title>
		<link>http://www.ewea.org/blog/2012/03/wind-energy-and-other-renewables-much-cheaper-than-coal/#comment-12796</link>
		<dc:creator>Olivier Balhan</dc:creator>
		<pubDate>Fri, 16 Mar 2012 10:32:03 +0000</pubDate>
		<guid isPermaLink="false">http://www.ewea.org/blog/?p=3014#comment-12796</guid>
		<description><![CDATA[Dear EWEA Members,

Our 3 MW wind turbine&#039;s MWh production cost is lower than 20 EUR / MWh.

Still asking yourself why :

1. The Spanish governement took the decision of suspending/cancelling the renewable energy subsidiations/grants. They already knew ... Lobbying from us lead to this suspension ... ?

2.  Massachssetts&#039; decisoion this week ?

3.  UK&#039;s Crown Estate decision on next phase grants/subsidiations ?


Why woudl they pay if not needed ?


The fact 
 
Our patented technological concept allows the wind turbines to be more profitable without any green energy production subsidiations/grants paid by the government than the existing wind turbines with the current green energy production subsidiations/grants.
 
  
1.  What does the &quot;Power &amp; Torque Increase Box&quot; (hereafter designated as &quot;PTIB&quot;) ?
 
This PTIB can be applied as a wind turbine Power &amp; Torque Increase Box although the physical and mathematical dynamic models behind it are very complex.
 
It really does increase the wind turbine power &amp; torque from a &quot;same size blades + same design blades + same weather conditions + same wind speed&quot; : 
 
- by +200 % to +300 % in torque   ...   I know that you are thinking to the Betz law and so it is theoretically impossible. False !
 
I know that some world leading wind turbine manufacturers&#039; R&amp;D Directors are dreamin of increasing of +1% their efficiency and we here talk of +200 % to + 300 %. 
So, it does not seem serious, right ? Give us 30 minutes of your time for a live demonstration. 30 minutes. And you will change your mind.
 
- by   +20 % in production period : with the PTIB, high-scale wind turbines start producing at nominal power at 3 to 4 times lower wind speeds than usual,  that is to say from lower than 1 meter/second wind speeds.
 
And, the lower the wind speed, the higher the Power &amp; Torque Increase Difference (compared to current ones).
 

I have seen it working live. It works great. And it is very simple to apply to the real world utility wind turbines.
 

Several world leading top 20 wind turbine manufacturers have finally booked for a live demonstration in April 2012. We come with all our materials including : the &quot;wind turbine prototype&quot;, a wind tunnel system, Amp measuring system, Volts measuring systems, a tachimeter and ... the PTIB of course.
 
If your company has a WIND TUNNEL, we also come with both our 2 REAL WIND TURBINES OF 400 W - 600 W (120 cm blades), one equipped with the PTIB and one not.
 
A live demonstration can be organized at your company&#039;s offices or better at a WIND TURBINE STUDY OFFICE with a &quot;WIND TUNNEL TESTING LAB&quot;. 
 
 
A Non-Disclosure Agreement - including full-time voice and video recording by a certified Veritas, SGS or Group4-Securitas security agent - will be signed as soon as we receive your appointment date and time requests : first by scanned document e-mails and next on our arrival. 
 

I can say without complex that the world leading wind turbine manufacturers that will not have access to this new patented technology concept will disappear within the next 3 years. No more. No less. 

It will be publicly released by a GIANT COMPANY early April 2012.


Have a good day.
 
Best regards,
 
 

Olivier Balhan
International Consultant - New Technolgies
Renewables, Cleantech, Environment, Sustainability, Emission Reduction, Water Treatment
 
Phone / answering : +32 (0)87 77 14 44
Mobile phone      : +32 (0)493 72 82 18
 
Skype : balha76202
E-mail : olivier.balhan@skynet.be]]></description>
		<content:encoded><![CDATA[<p>Dear EWEA Members,</p>
<p>Our 3 MW wind turbine&#8217;s MWh production cost is lower than 20 EUR / MWh.</p>
<p>Still asking yourself why :</p>
<p>1. The Spanish governement took the decision of suspending/cancelling the renewable energy subsidiations/grants. They already knew &#8230; Lobbying from us lead to this suspension &#8230; ?</p>
<p>2.  Massachssetts&#8217; decisoion this week ?</p>
<p>3.  UK&#8217;s Crown Estate decision on next phase grants/subsidiations ?</p>
<p>Why woudl they pay if not needed ?</p>
<p>The fact </p>
<p>Our patented technological concept allows the wind turbines to be more profitable without any green energy production subsidiations/grants paid by the government than the existing wind turbines with the current green energy production subsidiations/grants.</p>
<p>1.  What does the &#8220;Power &amp; Torque Increase Box&#8221; (hereafter designated as &#8220;PTIB&#8221;) ?</p>
<p>This PTIB can be applied as a wind turbine Power &amp; Torque Increase Box although the physical and mathematical dynamic models behind it are very complex.</p>
<p>It really does increase the wind turbine power &amp; torque from a &#8220;same size blades + same design blades + same weather conditions + same wind speed&#8221; : </p>
<p>- by +200 % to +300 % in torque   &#8230;   I know that you are thinking to the Betz law and so it is theoretically impossible. False !</p>
<p>I know that some world leading wind turbine manufacturers&#8217; R&amp;D Directors are dreamin of increasing of +1% their efficiency and we here talk of +200 % to + 300 %.<br />
So, it does not seem serious, right ? Give us 30 minutes of your time for a live demonstration. 30 minutes. And you will change your mind.</p>
<p>- by   +20 % in production period : with the PTIB, high-scale wind turbines start producing at nominal power at 3 to 4 times lower wind speeds than usual,  that is to say from lower than 1 meter/second wind speeds.</p>
<p>And, the lower the wind speed, the higher the Power &amp; Torque Increase Difference (compared to current ones).</p>
<p>I have seen it working live. It works great. And it is very simple to apply to the real world utility wind turbines.</p>
<p>Several world leading top 20 wind turbine manufacturers have finally booked for a live demonstration in April 2012. We come with all our materials including : the &#8220;wind turbine prototype&#8221;, a wind tunnel system, Amp measuring system, Volts measuring systems, a tachimeter and &#8230; the PTIB of course.</p>
<p>If your company has a WIND TUNNEL, we also come with both our 2 REAL WIND TURBINES OF 400 W &#8211; 600 W (120 cm blades), one equipped with the PTIB and one not.</p>
<p>A live demonstration can be organized at your company&#8217;s offices or better at a WIND TURBINE STUDY OFFICE with a &#8220;WIND TUNNEL TESTING LAB&#8221;. </p>
<p>A Non-Disclosure Agreement &#8211; including full-time voice and video recording by a certified Veritas, SGS or Group4-Securitas security agent &#8211; will be signed as soon as we receive your appointment date and time requests : first by scanned document e-mails and next on our arrival. </p>
<p>I can say without complex that the world leading wind turbine manufacturers that will not have access to this new patented technology concept will disappear within the next 3 years. No more. No less. </p>
<p>It will be publicly released by a GIANT COMPANY early April 2012.</p>
<p>Have a good day.</p>
<p>Best regards,</p>
<p>Olivier Balhan<br />
International Consultant &#8211; New Technolgies<br />
Renewables, Cleantech, Environment, Sustainability, Emission Reduction, Water Treatment</p>
<p>Phone / answering : +32 (0)87 77 14 44<br />
Mobile phone      : +32 (0)493 72 82 18</p>
<p>Skype : balha76202<br />
E-mail : <a href="mailto:olivier.balhan@skynet.be">olivier.balhan@skynet.be</a></p>
]]></content:encoded>
	</item>
</channel>
</rss>

<!-- Dynamic page generated in 0.288 seconds. -->
<!-- Cached page generated by WP-Super-Cache on 2013-06-16 14:49:53 -->